Wednesday, 24 September 2014

Unwrapping the Present

It's the little girls birthday today and guess what...?

After 10 weeks the scaffolders have started to unwrap the house. It is just like unwrapping a huge present. Exciting!


I'm beginning to like the idea of a green roof now too...



here's a picture of the scaffold from down the road. I know the neighbours will be glad to see it go.


and from down the road the other way...


The scaffold roof is coming down later this week. So far, since the scaffold roof has been on we've had a relatively dry 3 months. So I wonder what the weather will be like by the end of the week...


Monday, 22 September 2014

The Roof is now complete...'


Well, it's almost complete. The roofing team came in this week and put the under felt? (I don't think it's called that anymore) on and added the batons to most of the roof. So now is all green inside when the sun shines through.


The only remaining piece of the old roofing material was removed. The felt had rotted away in some places to it was a good job we decided to replace it.


Removing this roof covering enabled the builders to assess how much they needed to build up the roof timbers to match the height of the new roof. They ended up adding about 50mm of new wood across the existing joists.


So now we have another pile of wood - I think this lot will be burned as we have stored as much as i think we can manage for now. (anyone want some?). In hindsight (what a wonderful thing that is) I feel we would have been better off replacing all the trusses across the whole roof. That would have saved us and the builders time and probably money in the long run. However, just for the record, we decided not to do that because of a number of factors: we thought it would be cheaper as the roof was not going to need updating; we wanted to keep that section of the house covered to protect (initially) some of the parts of the old house for future use; and finally because we had not plans for that section of roof it seemed senseless to remove it and replace it just for the sake of it. (that's me justifying it to myself by the way!)

With that rood underway the builders also planned out the hall way window. This was originally planned to be one big pane of glass. However, in discussions with the glazing man, Damien, (that worries me!) he suggested that a standard sized Velux may be a better option because they are a known great product that (normally) doesn't have any issues. He was concerned that a 'normal' pane of glass could leak around the flashings.

So, after some discussions we have decided to change the original design and go for two Velux windows - one will be a large, opening window and the other will be a smaller fixed Velux. Both will be joined together to form one large glass window.

Another discussion we have had is regards the guest ensuite upstairs. The surveyor had specified a particular type of roof light that would fit into the truss space of 395mm. however the builder has warned us against using those windows because in his experience whenever he sees one a few months or years after it is fitted they are generally always leaking. Now, that could be just his team not knowing how to fix them but i tend to go with his judgement. The only issue this threw up though was the fact that the minimum size for the alternative Velux window is bigger than the space we have between trusses. we asked the truss company and they have said we cannot cut of put holes in any of the trusses (I think this is more of a liability issue just in case it falls down but never the less I don't want to chance it).

The alternative we have chosen is to go for a Velux Sun Tunnel (http://www.velux.co.uk/products/sun-tunnels). It is a compromise but we have already specified one for the downstairs toilet and we have seen them in action and they look good and work well.



The roofers have done a great job so far. 



It is now feeling like a real house again after 9 weeks - albeit a green one! We have been told the scaffold roof is coming off soon after which the 'slaters' will be back to finish off.

Monday, 15 September 2014

The roof takes shape

The roof structure is now really taking shape.


Don't ask who the clown on the roof is...



roof covering has partly been put on today...


fascias and soffits have been added...









to be updated when i have time...

Monday, 8 September 2014

The Roof Structure Develops Further

Over the last week the Builders have been busy continuing to build the roof structure. 

The main bedroom has taken shape.


and they have now built up the side walls to form the window opening.



The loose fill wood work has been created in the front of the roof to form the landing window opening.

We now need to decide on the size of the window and its exact position. Our original idea was to have a full height window leading up from the top of the front porch for 2400mm. However the builder has asked us to think if this size is too big. So I climbed up on the scaffold and onto the loosely covered first floor trusses. I had hoped Claire would do the same, but.... I forgot she has a fear of heights. To help her the builders have put a rail on the edge of the landing, in the same place the fully formed rail will be, and also added a handrail to the top of the ladder.
So now Claire can actually go upstairs for once!


The three dormers have now been fully formed on the back of the house.

and the 'ladders' over each gable end have been attached and the brickwork built up to match.


These ladders provide a great way for the girls to climb up to the apex of the roof (but don't tell Claire!)



And Finally this week we had a visit from Uncle Stu. Yet again Claire chose not to look as he took the girls on a chimpanzee training classes...

Stu hanging from the top of the scaffold...

and doing what he does best...



Saturday, 6 September 2014

Return from Holiday

Sunday 31st August - The roof is in place already!

We arrived back from holiday last Sunday and were amazed. Justin and the building team had done a sterling job - the roof structure was in place already!



Justin told me that they worked late on the night the trusses were delivered to get as many in place with the crane before the bank holiday weekend. They solved the issues of how to slide each truss, weighing around 150kg and 9 metres wide by 5 metres high, along the wall plate.


The dormers have also been constructed using loose timber (not pre-formed trusses.



The Main Bedroom, in the gable end is looking good... 



Here's a view from the roof top (I am stood on the top of the end gable wall)


It looks like we've got 53 trusses in place, each with a top hat. This was needed because the truss height was too high for the telephone wires in the road so each truss was made in two pieces - the main bottom piece and then a pointed top hat.


The girls think it is looking good and are already planning their bedrooms.



Here's a view through the inside of the house to the end wall.


We are really pleased with the progress so far. It's all taking shape really quickly. Well done team!