and the walls came tumbling down...
another day brings more walls down... not that i was really expecting these ones to come down completely!
the builders decided that it was simpler to knock the walls down at the front of the house and then rebuild them. here they are starting on the kitchen end of the house.
the end result was a hole in the front of the house.
they also removed the back wall and the bi-fold doors
so now we have a house of two halves - literally! there is now nothing in the middle!
after the builders had gone today the crane driver, George, came round. He wanted to check on the access to the house for the crane and the lorry carrying the trusses.
As the large articulated lorry cannot get up the drive it was decided to load the trusses onto a normal rigid bed truck. Normally this wouldn't have been an issue... until today that is. It turns out that the rigid bed truck is higher than the low loader arctic lorry... this combined with the height of the trusses means they are now going to be higher than the max height permitted on UK roads!
So, (he says with a smile), the upshot is the trusses will have to be transported once again on the low loader. This will have to park somewhere outside the house on the road and the crane driver and builders are now going to have to man handle, with the aid of a small, mobile crane, the trusses up the drive an onto the front grass. From there the crane driver, using a bigger crane...
will then lift each truss into place. Sounds simple...?!